Soil Erosion and Sedimentation Control


In preparation for your upcoming project, it is important to secure all applicable permits and utilize best management practices when executing work.

A soil erosion and construction storm water permit is generally required for any earth change activity which disturbs one or more acres of land or which is within 500 feet of a lake or stream.

Before you start your next construction project, please contact Superior at (877) 667-4142 to see how our trained staff can assist you with:

  • Reviewing and/or designing Soil Erosion and Sedimentation Control Plans.
  • Performing weekly site inspections.
  • Making final decisions regarding Soil Erosion and Sedimentation Control Permit issuance or denial.
  • Assisting with determinations for noncompliance with Part 91.
  • Developing plans and providing updates.
  • Reviewing and/or designing Soil Erosion and Sedimentation Control Measures.
  • Making design determinations for Soil Erosion and Sedimentation Control Measures (e.g. sediment basins, diversions, riprap sizing, etc.).
© Superior Environmental Corp
1128 Franklin Street
Marne, MI USA 49435
p: (877) 667-4142
f: (616) 667-3666